The following lines were added (+) and removed (-):
Homes built prior to the early 1960’s were most commonly wired with a two-wire system, absent of the modern third wire being an equipment ground wire. The first requirement for grounded receptacles in residential construction dates back to 1951 when the NEC (National Electrical Code) required laundry areas to have grounded receptacles. [[Image:ungroundedplug.png]] Homes built prior to the early 1960’s were most commonly wired with a two-wire system, absent of the modern third wire being an equipment ground wire. The first requirement for grounded receptacles in residential construction dates back to 1951 when the NEC (National Electrical Code) required laundry areas to have grounded receptacles.