Changes

SWIARC Saturday Noon Swap Net

11 bytes added, 17:39, 2 September 2017
/* Saturday, March 25, 2017 */
The following lines were added (+) and removed (-):
  kc0mux Robert 5 sections of BX tower w tilt over and heavy duty mast $325, Ameritron amp 811h $600,    kc0mux Robert <del>5 sections of BX tower w tilt over and heavy duty mast $325, Ameritron amp 811h $600,</del>   <del>cushcraft vhf 13 el beams (2) $130 pair or $70ea</del>, ph (712) 314-8830  <del>cushcraft vhf 13 el beams (2) $130 pair or $70ea, ph (712) 314-8830</del>
Administrator
4,579
edits